Technical Report
Conceptual Restoration Plan Active Floodplain of the Rio Grande - San Acacia to San Marcial, NM: Phase III
Date: 2004/02/01
Author(s): Tetra Tech, Inc. and ISG, Surface Water Group
Publication: Report prepared for Save Our Bosque Task Force
Abstract:
This document presents the selection criteria for restoration techniques to support a conceptual floodplain restoration plan for the Middle Rio Grande reach from San Acacia to San Marcial. The overall goal of the project is to develop a comprehensive river and floodplain restoration plan for the Rio Grande reach from San Acacia to San Marcial. This report discusses Phase III of a six phase process that includes:
I. Data Collection and Analysis
II. Specific River Issues
III. Development of the Restoration Concepts and Strategies
IV. Development of the Restoration Plan for the Riparian Corridor
V. Preparation of the Monitoring Plan
VI. General Instructions and Information
Related Information
-
recommended documents